Prior to each use
- Check for loose bolts / nuts.
- Presence and legibility of the safety stickers
- Check for any damage to the hydraulic components.
- Check the tire pressure. (11.6-26 PSI)
- Check the roller bearings and the drive line and grease all (13 points, see manual for details) lubricating points. (1-2 shots High Grade Grease HT Q9)
After every use
- Clean the machine.
- Caution required with the bearings if a high pressure washer is used.
After the first 20 operational hours (new or repaired)
- Grease all lubricating points (1-2 shots EP2 + High Grade)
- Check the roller bearings and the drive line.
- Check for any damage to the hydraulic components.
- Check for loose bolts / nuts.
After every 80 operation hours or annually
- Check the roller bearings and the drive line and grease all lubricating points.
- Check for loose bolts / nuts.
- Check the hydraulic components are working properly and for any damage.
- Check the tension of conveyor.
- Check the gearboxes and the oil level in the gearboxes.
- Check and lubricate the PTO shafts.
After every 500 operational hours
- Replace the oil in the gearboxes.
ABRIDGED MAINTENANCE SCHEDULE PTO
Periodic maintenance:
- Grease the lubricating points every 80 operational hours or after a long period of inactivity.
- Check the PTO for any damage to the safety guards and replace these if they are no longer sound.
- Check that the safety stickers are in place on the PTO and are not damaged.
Annual maintenance:
- Remove the PTO from the machine.
- Inspect the PTO parts.
- Arrange all parts and carefully inspect them.
- Replace any damaged or worn parts.
- Clean all grip connections between parts.
- Reassemble all parts.
- Grease both tubes and reassemble both PTO parts.
- Reassemble the PTO and fit it to the machine.